国产成人精品无码片三区四区,亚洲婷婷综合色高清在线,www.久久色,亚洲综合网在线,亚洲免费在线看,亚洲第一香蕉视频,亚洲视频手机在线观看

Today:
首頁(yè) > English > News Gallery > Company Everts > Company News

The First Pier for Mengxi Central China Railway Lines is Successfully Built

Source:    Date:2014-05-05  

On April 29, along with the final batch of concrete is cast, concrete for pier capping of Bridge Pier No. 10 for Mengxi Central China Railway Lines is successfully cast, it indicates that the first pier for Mengxi Central China Railway Lines is Successfully Built.

 

Gong’an Yangtze River bridge undertaken by China Major Bridge Engineering Co.,Ltd.(MBEC) is the first heavy load railway bridge across Yangtze River in China, adopting circular arch portal structure having depth of 21.6m, width 17.5m, and total concrete of 1496 m3. The on-schedule completion of such bridge pier lays solid and sound foundation for the launching of steel girders on side span.

up:

next: